2018 Field Maintenance Update
- Hedrick & Floyd Taylor Fields
- Passaic River Park
- Sansone Fields
- Snyder Avenue Turf
- Upper Columbia Field
- Veterans Memorial Park
- Assessment done to determine feasibility of installing a turf field
- Further studies will be done in 2018 to determine cost
- Large debris removed from field
- Liter collected on and around field
- Assessment of field was performed by the Union County Field Manager in Fall 2017
- The Recreation Director recently approved an Eagle Scout project to install benches and equipment storage box on the field. Awaiting final approval from Union County
- Union County Field Manager requested an engineering study be done to determine how to improve drainage and overall field conditions
- Clay will be added to Sansone 1 and Sansone 2 fields as soon as the equipment can safely be driven onto the fields
- Dangerous branches hanging over and near dugouts were removed
- Fields evaluated in Fall 2017 with the Union County Field Manager. The Union County Field Manager recommended replacing the curbing to address infield erosion issues. We are working with Union County to obtain a date the curbing will be replaced
- Most debris removed from fields
- Broken tree limbs removed from trees in parking lot
- Compression test to be performed on turf in Spring 2018
- Debris collected from:
- In wooded area
- Inside and outside turf field
- On and under bleachers
- Parking lot
- Sanitized and vacuumed in April 2018
- Dugouts have been installed at the softball field
- Fence to be added behind dugouts as soon as weather permits
- Large debris removed from field
- Stone and clay floor will be installed as soon as weather permits
- Baseball field removed in 2017 to provide an additional soccer field (completion date is Fall 2018)
- Rested in 2017
- Slit and seeded